Installation of the COM System in Line 1 & 2 for Riyadh Metro Project
Project Overview
Duration | 2 years |
Competent Department | TI/ICT BU |
Customer Name | SEIMENS |
Starting Date | 5/1/2022 |
Project Value (in Local Currency) | 7.2 M SAR |
Short Briefing | The Scope of work of this project is the Survey, Installation, Testing & Commissioning for COM systems in Riyadh Metro line 1 & 2 for the following subsystems: ACID: Access Control and Intrusion Detection. CCTV: Closed-Circuit Television. CTN: Cable Transmission Network Cabinet. PABX: (Private Automatic Branch Exchange) Telephony /Intercom. MCS: Master Clock System. PDC: Power Distribution Cabinet. |